Main Article Content

John N. Dyer

Abstract

Parameter estimates used in control charting, the sample mean and variance, are based on maximum likelihood estimation (MLE). Unfortunately, MLEs are not robust to contaminated data and can lead to improper conclusions regarding parameter values. This article proposes a more robust estimation technique; the minimized integrated square error estimator (L2E).

Article Details

Section
Articles